Greenheck Fieldhouse Facebook
Construction is now complete.  Please use this page to watch how the project came together.


More new equipment has arrived 6/24/13
DSC02147-web
DSC02148-web

First workout in the new facility 5/30/13
dsc02025-web
dsc02026-web

Our fitness center will officially open to members after 2pm today! 5/30/12
DSC02022-web

New cardio equipment install 5/29/13
dsc02016-web
DSC02018-web

Assembling strength training equipment 5/28/12
dsc02011-web
dsc02013-web

All the rubber flooring has been rolled out.  Some trimming and gluing work remains. 5/24/13
dsc02010-web

About two-thirds of the rubber floor has been rolled out and workers have began gluing it in place 5/22/13
DSC02008-web

Our first shipment of new equipment has arrived!  These Cybex Arc Trainers will be a great addition to the facility. 5/21/13
DSC02003-web

Rubber flooring is being laid out and cut to fit prior to being glued down 5/20/13
dsc02000-web

Rubber flooring for weight room has arrived on site 5/17/13
DSC01831-web

Very nice mural painted in the new addition 5/13/13
dsc01825-web

Sound system and mirrors in both locations 5/9/13
dsc01667-web
dsc01670-web
dsc01668-web
dsc01669-web

Mirror installation in the aerobics studio 5/7/13
dsc01664-web

Finished floor in our new studio 5/6/13
dsc01663-web

Sanding the new wood floor 5/3/13
dsc01654-web

Installing rails to support the mirrors in the aerobics studio and new bottle filling drinking fountains (3 in total). 5/2/13
dsc01649-web
dsc01646-web

Work continues on the wood floor in the aerobics studio 5/1/13
dsc01637-web

Tile and hardwood floor intstallation 4/30/13
dsc01622-web
dsc01629-web
dsc01628-web

Interior door installation 4/26/13
dsc01342-web
dsc01344-web

Lights are on in most of the addition.  Many contractors have been here this week working on their parts of the project. 4/24/13
dsc01335-web
dsc01336-web
dsc01338-web

Suspended ceiling grid installed in aerobics studio 4/23/13
dsc01329-web

One indoor and 3 outdoor air handlers from Greenheck Fan Corp. installed today 4/18/13
dsc01264-web
dsc01227-web
dsc01232-web
dsc01253-web
dsc01263-web

The painting crew worked through the weekend, making quite a bit of progress 4/15/13
dsc01187-web
dsc01188-web
dsc01190-web
dsc01193-web

HVAC, electrical and painting underway 4/12/13
dsc01172-web
dsc01174-web
dsc01177-web

Painting in the aerobics studio and main room of the fitness center 4/11/13
dsc01146-web
dsc01149-web
dsc01150-web

Work continues with electrical, HVAC and sprinkler system installations 4/8/13
dsc01126-web
dsc01128-web
dsc01111-web

Progress on the exterior of the fitness center 4/4/13
dsc01094-web
dsc01099-web
dsc01102-web
dsc01114-web

Building the mechanical closet in the fitness center 4/2/13
dsc01088-web

Interior wall construction and installing duct work in the aerobics studio 4/1/13
dsc01083-web
dsc01086-web

The concrete floor is done and work continues on the exterior siding 3/29/13
dsc01075-web
dsc01046-web
 dsc01048-web

More concrete poured today 3/27/13
dsc01031-web

Fresh concrete in the cardio area 3/26/13
dsc01021-web

The in floor electrical is installed and work continues outside putting up siding 3/25/13
dsc01012-web
dsc01015-web

Laying out the in floor electrical for the cardio area 3/21/13
dsc00841-web

Pouring the floor in the aerobics studio 3/20/13
dsc00830-web
dsc00812-web
dsc00821-web

Aerobics studio is ready for concrete 3/19/13
dsc00809-web

Part of the building floor is thawed and ready for concrete preparations and the heating coils have been moved to another section of the building 3/18/13
dsc00805-web
dsc00807-web

Decorative block and steel siding installation 3/15/13
dsc00702-web
dsc00701-web

Decorative block and steel siding installation 3/14/13
dsc00695-web
dsc00697-web

Continuing to thaw the ground inside the fitness center
3/8/13
dsc00684-web
dsc00686-web

Installing roof and wall insulation 3/7/13
dsc00678-web

Work continues on the roof 3/6/13
dsc00674-web

 